Electro World

Participation in the construction of the Electro World store in Glyfada. Among the work carried out was the installation of air conditioning and ventilation, fire-fighting network, the construction of WC, plumbing and sanitary items and the installation of a PPC substation.

The store has 4 levels, basement, ground floor and two floors. The ground floor and the two floors serve as a sales outlet, while the underground, apart from a retail space, also serves as storage space.

Type of building Store
Service Construction
Surface 4.400 sqm
Levels 4
Year 2008
Back to profile
/