The construction of Kozani County Court was completed in 2008 after 7 months of work.
For the construction of the court building, an old building was demolished and excavations were carried for foundation as well as concreting the entire building. Other works that were carried were the construction of brickworks and drywall partitions, the housetops and roof water-heat insulation, the construction of tile roofs, the supply and installation of aluminum partitions in the offices, the installation of railings in stairwells and terraces and finally the electromechanical works such as air-conditioning and ventilation installation and a lift for the public and staff.
Type of building Court Building
Service Construction
Surface 800 sqm
Levels 2
Year 2008